Metro Operation Health Monitoring

Project Name

Metro Operation Health Monitoring
Shanghai Metro Line Project

Equipment Configuration

The testing system included two sets of dynamic data testing and analysis systems, sixty-four strain gauges, and twenty-nine accelerometers.

Project Description

Sensors were installed at designated monitoring points both inside and outside the metro vehicle structure and connected to the data acquisition system. During operation, strain and acceleration data at key locations were continuously collected.

The acquired data were processed and analyzed to evaluate the structural health and dynamic performance of the metro system under real operating conditions. The results provided a reliable basis for operational safety assessment, maintenance planning, and performance optimization.